CYLINDER HEAD GASKET
REMOVAL AND INSTALLATION
Pre-removal Operation
D
Fuel Line Pressure Releasing
(Refer to GROUP 13B – On-vehicle Service.)
D
Engine Oil Draining
(Refer to GROUP 12 – On-vehicle Service.)
D
Thermostat Case Assembly Removal
(Refer to GROUP 14 – Water Hose and Water
Pipe.)
4.9 Nm
8.8 Nm
9
17
4
18
3
12
13
16
Removal steps
1. Accelerator cable connection
2. PCV hose
3. Vacuum hose connection
4. Boost sensor and bracket assembly
5. Brake booster vacuum hose con-
nection
6. Detonation sensor connector
7. Injector connector
8. Intake air temperature sensor con-
nector
ENGINE <4G1> –
9.8 Nm
1
10
9
15
5
Cylinder Head Gasket
Post-Installation Operation
D
Thermostat Case Assembly Installation
(Refer to GROUP 14 – Water Hose and Water
Pipe.)
D
Engine Oil Supplying
(Refer to GROUP 12 – On-vehicle Service.)
D
Accelerator Cable Adjustment
(Refer to GROUP 17 – On-vehicle Service.)
17
11
Engine oil
7
8
2
6
14
9. Purge control solenoid valve con-
nector
10. EGR solenoid valve connector
11. Distributor connector
12. Throttle position sensor connector
13. Idle speed control servo connector
14. Earth cable connection
15. Water hose connection
16. Heater hose connection
CA 17. High–pressure fuel hose connection
18. Fuel return hose connection
11B-21
11200400757
O–ring
Delivery pipe