ENGINE <4G1> –
CAMSHAFT AND CAMSHAFT OIL SEAL
REMOVAL AND INSTALLATION
Pre-removal and Post-installation Operation
D
Air Cleaner Removal and Installation
D
Distributor Removal and Installation
(Refer to GROUP 16.)
D
Timing Belt Removal and Installation
(Refer to P.11B-25.)
3.5 Nm
1
28 – 34 Nm
7
Removal steps
1. PCV hose connection
2. Accelerator cable clamp
<L.H. drive vehicles>
3. Rocker cover
D Valve clearance adjustment
(Refer to P.11B-9.)
AA
BA 4. Camshaft sprocket
Camshaft and Camshaft Oil Seal
9.8 Nm
2
6
3
5
4
88 Nm
AA 5. Camshaft oil seal
6. Rocker arm and shaft assembly
7. Camshaft
11B-15
5
Lip
section
7
Cam section and
journal section
Engine Oil
11200190524