15-4
<MPI>
Pre-removal Operation
D
Fuel Discharge Prevention
(Refer to GROUP 13B – On-vehicle Service.)
D
Engine Coolant Draining
(Refer to GROUP 14 – On-vehicle Service.)
D
Air Cleaner Removal
D
Throttle Body Removal (Refer to GROUP 13B.)
8.8 Nm
11
12
3
Removal steps
1. PCV hose
2. Vacuum hose connection
3. Brake booster vacuum hose
connection
4. Detonation sensor connector
5. Injector connector
6. Intake air temperature sensor
connector
INTAKE AND EXHAUST –
9
2
8
7
6
Intake Manifold
Post-installation Operation
D
Throttle Body Installation (Refer to GROUP 13B.)
D
Air Cleaner Installation
D
Engine Coolant Supplying
(Refer to GROUP 14 – On-vehicle Service.)
O-ring
11
5
Engine oil
5
2
4
1
2
10
7. Purge control solenoid valve
connector
8. EGR solenoid valve connector
9. Control wiring harness
10. Earth wire connection
AA 11. High-pressure fuel hose connection
12. Fuel return hose connection
Delivery pipe