Replenishment Pumps Calibration - AGFA Avantra 36/44 Service Manual

Table of Contents

Advertisement

Avantra 36/44 Service Manual
CAUTION:
cessor is plugged in, or the CPU fuse will fail.
5. Switch on the mains (i.e., restore power to the processor).

4.3.3 Replenishment Pumps Calibration

To Calibrate the Replenishment Pumps:
1. Adjust the replenishment pumps:
a.
Remove the replenishment J hook from the side of the tank (Dev/Fix),
and place it in a 1000 ml graduated beaker.
b. Press the manual replenishment key to remove air from the replenish-
ment hose. You may have to repeat this several times to clear all the air
bubbles.
c.
Empty the beaker.
d. Press the manual replenishment key and check the amount of replen-
ishment released. Repeat several times (minimum of three pulses).
e. Measure the total amount of replenishment released and divide by the
number of times you pressed the replenishment key to obtain an aver-
age value. The correct amount should be 100 ml.
2. If the amount released (see 1e above) does not equal 100 ml for either the
developer or fixer, you must make the adjustment using the service pro-
gram. Follow this procedure:
a.
Switch the processor off.
b. Press the following keys:
AUTO
DRYER SAVER
+
TIME
The display should read:
Service Code ___.
4-12 Maintenance
Never connect or disconnect the cable when the pro-

Advertisement

Table of Contents
loading

This manual is also suitable for:

Avantra 36s/44s

Table of Contents