Unpacking And Preparing The Olp Engine - AGFA Avantra 36/44 Service Manual

Table of Contents

Advertisement

Avantra 36/44 Service Manual

1.3.4 Unpacking and Preparing the OLP Engine

1. Take the pallet with the engine crate to the site where the OLP is to be
installed. If this is not possible, unpack, remove, and transport the OLP
engine according to the followings steps.
2. Using strap cutters, cut the straps from around the wooden crate.
3. Using a crowbar and claw hammer, open the crate.
4. Remove the cardboard cover and the plastic cover.
1-8 Installation
Figure 1-5 Engine crate.
–Bottom shipping crate. –Engine packing.
1
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Avantra 36s/44s

Table of Contents