Chapter 2: Bridge Functional Analysis; Introduction - AGFA Avantra 36/44 Service Manual

Table of Contents

Advertisement

Chapter 2:
Bridge
Functional
Analysis
2.1

Introduction

The internal bridge option integrates the Avantra and an on-line processor into
one complete imaging system. Because the bridge is internal to the imagesetter,
the usual long media transport path associated with bridges/on-line processors is
greatly reduced. This provides better performance and more reliable operation.
It also reduces the required floor space by approximately 30%.
This chapter provides information on the following:
Information to come.
2-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Avantra 36s/44s

Table of Contents