Aligning The Solid Stops - AGFA Avantra 36/44 Service Manual

Table of Contents

Advertisement

1.5.4 Aligning the Solid Stops

Tools required: Loctite, 9/16" wrench
Steps
NOTE: If the take-up platform in your system does not have the
solid stop pad areas (see Figure 1-18), then you must install
a newer platform.
1. Put Loctite on the knurl of the solid stop pad. Refer to Figure 1-18.
2. Put the solid stop pad in the hole in the imagesetter take-up platform.
Refer to Figure 1-18.
3
Figure 1-18 Aligning the solid stops.
–Solid stop pad. –Put Loctite here (left and right). –Adjustment nuts.
3. Close the bridge, and put it in heavy mode.
You can move the shuttle shaft manually, if the bridge is not already in
heavy mode.
4. Screw the solid stop down against the stop pad of the take-up platform.
Refer to Figure 1-18.
5. Using a 9/16" wrench, screw the top adjustment nut to the top and tighten
it. Refer to Figure 1-18.
1
Section II: Bridge
2
Installation
1-17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Avantra 36s/44s

Table of Contents