Figure 1-13 Attaching the gas shock.
–Bridge mount casting. –Lower mount casting. –Gas shock.
3. Lower the bridge slowly to make sure that the shocks work.
4. Lift the bridge and check the guide block for scuffing (see Figure 1-10).
Lower the bridge and, with a flashlight, check again that the guides are not
hitting the plate.
2
3
Section II: Bridge
1
Installation
1-13