Imagesetter Electrical
Volts:
Amp:
Rec:
Power:
1.2.4 Operational
OLP Water Requirements
Water connection:
Drain:
Water consumption:
1.3
OLP Unpacking Procedures
1.3.1 Tools Required for OLP Unpacking
•
Crowbar
•
Claw hammer
•
Strap cutters
1.3.2 OLP Inventory
The Avantra 36/44 OLP arrives in two crates. The top crate contains the OLP
parts including:
1. Receiver basket (1 of 2)
2. Receiver basket (1 of 2)
3. Rear exit panel (bottom)
4. Middle top cover
5. Rear exit panel (top)
6. Rear top side panel
7. Rear top side panel
8. Front top Side panel (control)
9. Evaporation cover
10. Right lower door
Section IV: On-line Processor
115/230
5 / 2.5
NEMA 5-20R
575 Watts
3/4" BSP (0.3-10 bar, max. temp. 110˚ /43˚C)
5.3 US Gal. (3 x Ø25 mm, 3 x 20 L/min)
0.5 US Gal. (0-2 L/min)
Installation 1-3