32. Partially fill the replenishment containers with water and insert the replen-
ishment hoses and level sensors.
33. Set the main power switch to on.
34. Turn on the main water supply valve.
35. Turn on the processor.
36. Check that the circulation pumps operate and that all air is expelled from
the pumps and hoses.
CAUTION: Do not allow circulation or replenishment pumps to run
dry at any time or pumps may be damaged.
37. Allow the processor to warm up to operating temperature; check the sys-
tem for possible leaks.
38. Feed a piece of media through the processor to confirm proper transport.
39. Check transport speed as follows:
a.
Refer to the calibration procedure.
b. Enter service code 112.
c.
Compare the preset motor speed value to the actual value.
d. If the values do not correspond, proceed with the motor calibration
procedure.
42. Turn the processor off and turn the main power switch off.
43. Shut off the main water supply and remove the lids, crossover guides, and
racks.
44. Using the T-wrench, remove the overflow tubes and allow the tanks to
drain completely.
45. Wipe down the tanks to remove any remaining residue and water.
Section IV: On-line Processor