Thermo Scientific ISQ 7000 Hardware Manual page 396

Mass spectrometers
Table of Contents

Advertisement

3
Advanced Maintenance
Replacing the Calibration Gas Components
368
ISQ 7000 Hardware Manual
Note Be careful when mounting the new transfer line. Ensure the glass braid insulation
protects the wires from being pinched and shorted to the metal of the transfer line.
16. Reconnect the two connectors on each side of the transfer line.
Figure 419. Reconnecting the Transfer Line Tubing
17. Replace the glass manifold cover.
18. Slide the right side panel back onto the instrument and reattach the screws.
19. Replace the top cover and tighten the screws.
20. Reposition the instrument closer to the GC.
21. Restart your system by following the instructions in
Connectors
"Restarting the System"
on
page
165.
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents