Connection of Coolant ....................8 2.10.1 Install water chiller ..................... 8 Setting the Cetac Personality for all iCAP 7000 Series ............. 9 iCAP 7600 Sprint Valve installation guide ................ 10 Installing Software ......................11 Additional Schematics Detailing the Plumbing Options for the iCAP 7600 Valve... 12...
7000 Series ICP-OES Spectrometer Installation Details Introduction Detailed below is the installation procedure for the spectrometer. It is very important that these procedures are followed, in correct order and taking account of the time delays required. Failure to do so can result in extended installation and possible damage. The procedures and delays are designed to prevent problems with purge, software, firmware and hardware.
7000 Series ICP-OES Spectrometer Installation Details Installation Pre-Installation Requirements Ensure that the requirements detailed in the Pre-Installation checklist are provided in the location chosen by the user. Read each section of the site Pre-Installation guide to verify site, gas, chiller, extraction and waste requirements are met or set during the installation process.
7000 Series ICP-OES Spectrometer Installation Details supplied with the equipment. 2.4 Locate Instrument Once the site requirements are confirmed as acceptable, prepare to install the instrumentation. 2.4.1 Position iCAP Lift spectrometer on to the bench (using 4 people to lift).
7000 Series ICP-OES Spectrometer Installation Details Be sure to orientate the filter correctly, using the arrow marking the direction of gas flow. Make sure the customer is aware that they must check the gas filters periodically. Set the argon pressure gauge to 80psi/ 5.5bar*, the nitrogen purge pressure to 45psi/ 3.0bar to 80psi/5.5bar (if used) and the additional gas (7600 only) to 30psi/2.0 bar (if used).
7000 Series ICP-OES Spectrometer Installation Details 2.10 Connection of Coolant 2.10.1 Install water chiller ♦ Follow the instructions supplied with the chiller. ♦ Connect up the water chiller to the push-fit ports on right hand side of instrument (taking care to connect...
7000 Series ICP-OES Spectrometer Installation Details Setting the Cetac Personality for all iCAP 7000 Series Follow the unpacking and assembly instructions for the autosampler. Connect the serial cable between the PC and the autosampler and the power supply to the autosampler: NOTE: It’s imperative that the Cetac Autosampler firmware Personality is configured for the...
7000 Series ICP-OES Spectrometer Installation Details 4. iCAP 7600 Sprint Valve installation guide Note: This section only applies to iCAP 7600 systems: Connect the serial cable between the iCAP and the autosampler, and the power supply to the autosampler:...
7000 Series ICP-OES Spectrometer Installation Details Installing Software For Qtegra ISDS see Installation part 2 of 3 Page 11 of 14 Version 4301 460 00632...
7000 Series ICP-OES Spectrometer Installation Details 6. Additional Schematics Detailing the Plumbing Options for the iCAP 7600 Valve. Standard configuration for loading a sample into the sample loop. Standard configuration for the injection of the sample from the sample loop.
Page 13
7000 Series ICP-OES Spectrometer Installation Details Configuration for loading a sample into the sample loop with an additional standard. Configuration for the injection of the sample from the sample loop with an internal standard. Page 13 of 14 Version 4301 460 00632...
Page 14
7000 Series ICP-OES Spectrometer Installation Details Valve configuration for Manual Sampling. Page 14 of 14 Version 4301 460 00632...