Thermo Scientific ISQ 7000 Hardware Manual page 42

Mass spectrometers
Table of Contents

Advertisement

1
Performing Routine Maintenance
Powering Off the ISQ 7000 Mass Spectrometer
14
ISQ 7000 Hardware Manual
6. If you are using hydrogen as a carrier gas, unscrew the hydrogen safety screw on the front
door.
.
Figure 5.
Powering Off the ISQ 7000 Instrument
Hydrogen Safety Screw
(On Front Door Panel)
7. Open the front door of the instrument.
8. Look behind the right side of the vacuum interlock shield and twist the vent valve knob
one-and-a-half times in a counter-clockwise direction to open the vent.
9. Wait five minutes for venting to complete.
CAUTION - INSTRUMENT DAMAGE Do not proceed until the instrument is vented, or
pieces of the column or ferrule might blow into the instrument. To ensure that the
instrument is vented, check how much the glass cover compresses the top cover o-ring in
the manifold. Once the o-ring surface touching the glass is about 1 mm, it is safe to open
the instrument and remove the column.
ATTENTION DOMMAGES À L'INSTRUMENT Ne pas poursuivre tant que l'instrument n'a
pas été ventilé, ou des morceaux de la colonne ou de la virole pourraient éclater dans
l'instrument. Pour vous assurer que l'instrument est ventilé, vérifiez dans quelle mesure le
couvercle en verre comprime le joint torique du couvercle supérieur dans le collecteur.
Lorsque la surface du joint torique en contact avec le verre équivaut à environ 1 mm, vous
pouvez sans danger ouvrir l'instrument et enlever la colonne.
Hydrogen Safety Screws
Vacuum Interlock Shield
Power Switch
Vent Valve
Knob
Thermo Scientific

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents