Measurement Event Synchronization; Description; Initiate:done - Agilent Technologies 8960 10 Series Reference Manual

Wireless communications test set, gsm mobile test application
Hide thumbs Also See for 8960 10 Series:
Table of Contents

Advertisement

Measurement Event Synchronization

February 14, 2000

Description

Measurement event synchronization saves time by controlling the communication between the controller, the
test set, and the mobile station, so that no device does something before it is supposed to (which can cause
errors or do something well after it could have). Because some measurements can run concurrently, it is
necessary that the control program know when individual measurement results are available.
Measurement event synchronization is accomplished using the INITiate subsystem's command
INITiate:DONE? or the STATus:OPERation:NMRReady status registers.

INITiate:DONE?

The INITiate:DONE? query returns a string that indicates what, if any, measurements are ready to be
fetched. This query should be used inside a loop, checking each measurement that was initiated. See
"INITiate:DONE?" on page 357
The INITiate:DONE? query returns at least one of the following indicators for each pass through the loop:
• "TXP" - The transmit power measurement results are available
• "PVT" - The power versus time measurement results are available.
• "PFER" - The phase and frequency error measurement results are available.
• "FBER" - The fast bit error measurement results are available.
• "BERR" - The bit error measurement results are available.
• "AAUD" - The analog audio measurement results are available.
• "DAUD" - The decoded audio measurement results are available.
• "ORFS" - The output RF spectrum measurement results are available.
• "DPOW" - The dynamic power measurement results are available.
• "IQT" - The I/Q Tuning measurement results are available.
• "WAIT" - There are one or more measurements which are in the measuring state which are not excluded
from the query. See
returned at least one measurement is not ready to be fetched yet.
• "NONE" - There are no measurements currently in the measuring state. This assumes no measurements
have been excluded. See
indicate that all measurements results are available or none have been initiated.
for more details about this query.
"INITiate:DONE:FLAG<measurement mnemonic>" on page
"INITiate:DONE:FLAG<measurement mnemonic>" on page
S:\Hp8960\E1960A GSM Mobile Test Application\A.04 Release\Reference_Manual\Chapters\prog_meas_synch.fm
Measurement Event Synchronization
358. When WAIT is
358. This would
132

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

E5515aE5515bE1960a

Table of Contents