Acura Integra 1998 Service Manual page 58

Integra 1998
Hide thumbs Also See for Integra 1998:
Table of Contents

Advertisement

Engine Removal/lnstallation
{cont'dl
7.
Install the left front mount, then tighten the bolts in
the numbered sequence shown (O - @).
O t 2 x
' 1 . 2 5 m m
83 N.m 18.5 kgt.m,61 lbl.ft)
Fleplace.
@ 1 2 x 1 . 2 5 m m
59 N.m 16.0 kgf.m,
43 lbf.frl
Replace.
O 1 0 x 1 . 2 5 m m
il4 N.m 14.5 kgt'm,33 lbt.ft)
, 5 - 1 6
. C h e c k t h a t t h e s p r i n g c l i p o n t h e e n d o f e a c h
driveshaft clicks into place.
CAUTION: Use new spring clips.
. Bleed air {rom the cooling system at the heater
valve open (see page 10-6).
. Adjust the throttle cable (see section 1 1).
. Check the clutch pedalfree play (see section 12).
. C h e c k t h a t t h e t r a n s m i s s i o n s h i f t s i n t o g e a r
smoothlY.
. Adjust the tension of the following drive belts.
Alternator belt {see section 23).
P/S pump belt (see section 171.
A/C comDressor belt (see section 22).
!
Inspect for tuel leakage (see section 1ll.
. After assembling fuel line parts, turn on the
ignition switch (do not operate the staner) so
that the fuel pump operates for approximately
t w o s e c o n d s a n d t h e f u e l l i n e p r e s s u r i z e s .
Repeat this operation two or three times and
check for tuel leakage at any point in the {uel
l i n e .

Advertisement

Table of Contents
loading

Table of Contents