Acura Integra 1998 Service Manual page 484

Integra 1998
Hide thumbs Also See for Integra 1998:
Table of Contents

Advertisement

From pege 14-66
Chock Shitt Control Solonoid
Valvo Alor a Short Circuit:
1. Disconnect the 3P connector
trom lhe shift control solenoid
valve assembly,
2. Check lor continuity betwoen
the A3 and A13 or A26 termi-
nals,
Rapair sho.t to ground in ths
wi.c batwocn tha A3 torminal
ind th6 shift control 3olanoid
Mearur. Shitt Control Sol.noid
Valv. A Re3istsnce at th. Sol€-
noid Connactor:
Measur€ the rosistance between
terminal No. 1 of the shift control
s o l e n o i d c o n n e c t o r a n d b o d y
oround.
C h c c k t o r o o e n i n t h 6 w i r 6
betwocn the A3 tclminll .nd tho
.hift control 3ol6noid vrlvo A.
ls the rosistsnce 12 - 25 0?
Repl.c6 th. .hltt control .016-
noid valvo aarcmbly.
TCM CONNECTOR A I26PI
WIRE SIDE OF FEMALE TERMINALS
SHIFT CONTROL SOLENOID
CONNECTOR
L l / i 3 t L
ar-urvelf-
@
I
L
--
TERMINAL SIDE OF MALE TERMINALS
14-67

Advertisement

Table of Contents
loading

Table of Contents