Create Or Modify Network Change Orders - Northern Telecom NAC User Manual

Network administration center
Hide thumbs Also See for NAC:
Table of Contents

Advertisement

Network Configuration Control 12-15

Create or Modify Network Change Orders

The Create or Modify Network Change Orders feature creates new change
orders or batch network configuration control jobs. All commands within a
change order are executed in the order they are recorded, one after another.
Change orders are most frequently attached to schedule definitions so they
can be executed repeatedly over a period of time (for example, once a day).
They can also occur on a specific date and hour. Change orders can also be
executed upon request without scheduling.
To define a new change order, fill in the fields. The three fields in the lower
portion of the screen specify the changes to be made by this change order.
If one of these is changed to "Yes", the Network Configuration Control
screen corresponding to that field appears. This is the same screen which
can be selected from the Network Configuration Control submenu.
Specify the changes to be made and select [Exit] from the Commands
menu to return to the change order screen. To display or modify the
changes already specified under one of the fields, move to that field and
press [Enter changes screen].
Network Administration Center Supervisor's User Guide Product release 2

Advertisement

Table of Contents
loading

Table of Contents