16-14 Schedule Definition

Fields

Attaching change orders to the schedule

P0724352 Standard 1.0
Schedule Name
Displays the name assigned to the schedule in the Schedule Definition
feature.
Scheduled Change Orders
Provides a list of the change orders assigned to this schedule.
Follow this procedure to attach one change order at a time to the schedule:
1
Press [Commands] from the main Schedule Definition screen or the
Schedule Definition–Attached Reports screen.
The Commands pop-up window appears.
2
Select the " Attach change orders to this schedule" option.
The Schedule Definition-Attached Change Orders screen appears as
shown in Figure 16-3. All of the change orders currently attached to this
schedule, if any, appear on the screen.
3
Position the cursor in the Scheduled Change Orders column and press
[Options].
A list of defined change orders is displayed in a pop-up window.
4
Select a change order from the pop-up window.
The pop-up window disappears and the selected change order appears
on the screen.
5
Repeat Steps 3 to 4 to add additional change orders.
6
To remove an existing change order, position the cursor on the change
order and press [Remove change orders].
7
Press [Commands] to display the Commands pop-up window and
select " Return to main schedule screen ".
The system returns to the main Schedule Definition screen.
8
Press [Commands] on the main Schedule Definition screen to display
the Commands pop-up window and select " Save as a new schedule
definition ".
Follow this procedure to attach multiple change orders to the schedule:
1
Press [Commands] on main Schedule Definition screen or the
Schedule Definition–Attached Reports screen.
The Commands pop-up window appears.
November 1994

Advertisement

Table of Contents
loading

Table of Contents