Northern Telecom NAC User Manual page 316

Network administration center
Hide thumbs Also See for NAC:
Table of Contents

Advertisement

16-8 Schedule Definition
P0724352 Standard 1.0
Undo changes to schedule definition
Removes all changes made to the schedule definition currently on
display, providing they were not saved.
Save as a new schedule definition
Saves the information as a new schedule definition.
Overwrite an existing schedule definition
Replaces an existing schedule definition with the schedule definition
currently on display.
Delete an existing schedule definition
Removes the schedule definition from the system.
Attach change orders to this schedule
Attaches change orders to this schedule.
Return to main schedule screen
Returns the system to the main Schedule Definition screen.
PF1=Select no command
Removes the Commands pop-up window from the screen.
PF2=Options
Displays a description or list of valid entries for the field.
PF2=Remove options pop-up
Removes the Options pop-up window from the screen.
F6=Add multiple reports
Allows more than one report to be added to the schedule at one time.
F6=Stop adding
Indicates that no more reports are to be added to the schedule, at this time.
This function key appears after [Add multiple reports] is selected.
Remove=Remove report
Removes a report from the schedule.
November 1994

Advertisement

Table of Contents
loading

Table of Contents