Northern Telecom NAC User Manual page 311

Network administration center
Hide thumbs Also See for NAC:
Table of Contents

Advertisement

Undo changes to schedule definition
Removes all changes made to the schedule definition currently on
display, providing they were not saved.
Save as a new schedule definition
Saves the information as a new schedule definition.
Overwrite an existing schedule definition
Replaces an existing schedule definition with the schedule definition
currently on display.
Delete an existing schedule definition
Removes the schedule definition from the system.
Attach reports to this schedule
Allows a report(s) to be attached to the schedule.
Attach change orders to this schedule
Allow a change order(s) to be attached to the schedule.
PF1=Select no command
Removes the Commands pop-up window from the screen.
PF2=Options
Displays a description or list of valid entries for the field.
PF2=Remove options pop-up
Removes the Options pop-up window from the screen.
PF3=Edit field
Allows the field to be edited.
PF3=End editing
Indicates that no further editing is required to the field.
Remove=Erase field
Removes the contents of a field.
Network Administration Center Supervisor's User Guide Product release 2
Schedule Definition 16-3

Advertisement

Table of Contents
loading

Table of Contents