Northern Telecom NAC User Manual page 247

Network administration center
Hide thumbs Also See for NAC:
Table of Contents

Advertisement

Undo changes to change order
Voids any changes made to the change order during the current session.
Save as a new change order
Saves the change order currently on display.
Overwrite an existing change order
Replaces an existing change order with the one currently on display.
This command is used when the original change order is no longer
needed.
Delete change order(s
Permanently removes a change order from the system.
Execute this change order
Executes the currently displayed change order. The change order is
sent to the execution queue.
Read adhoc change order
Displays the existing ad hoc change order.
PF2=Options
Displays a description or list of valid entries for the field.
PF2=Remove options pop-up
Removes the Options pop-up window from the screen.
PF3=Enter changes screen
Displays the corresponding Network Configuration Control screen for the
field on the change order screen. This function key is only available if
"Yes" appears in one of the fields of an existing change order. For example,
if "Yes" appears in the Change Day Routing Tables field, this function key
can be used to display the corresponding Change Network Day Routing
Tables feature.
Remove=Erase field
Removes the contents of a field.
Network Administration Center Supervisor's User Guide Product release 2
Network Configuration Control 12-17
)

Advertisement

Table of Contents
loading

Table of Contents