Northern Telecom NAC User Manual page 321

Network administration center
Hide thumbs Also See for NAC:
Table of Contents

Advertisement

Undo changes to schedule definition
Removes all changes made to the schedule definition currently on
display, providing they were not saved.
Save as a new schedule definition
Saves the information as a new schedule definition.
Overwrite an existing schedule definition
Replaces an existing schedule definition with the schedule definition
currently on display.
Delete an existing schedule definition
Removes the schedule definition from the system.
Attach reports to this schedule
Attaches reports to this schedule.
Return to main schedule screen
Returns the system to the main Schedule Definition screen.
PF1=Select no command
Removes the Commands pop-up window from the screen.
PF2=Options
Displays a description or list of valid entries for the field.
PF2=Remove options pop-up
Removes the Options pop-up window from the screen.
F6=Add multiple change orders
Allows more than one change order to be added to the schedule at one time.
F6=Stop adding
Indicates that no more change orders are to be added to the schedule, at this
time. This function key appears after [Add multiple change orders] is
selected.
Remove=Remove change order
Removes a change order from the schedule.
Network Administration Center Supervisor's User Guide Product release 2
Schedule Definition 16-13

Advertisement

Table of Contents
loading

Table of Contents