ABB IRB 6640 Product Manual page 233

Hide thumbs Also See for IRB 6640:
Table of Contents

Advertisement

Refitting cable harness - lower end
The procedure below details how to refit the lower end of the cable harness, Cleanroom.
3HAC026876-001 Revision: F
Action
1.
DANGER!
Turn off all electric power, hydraulic and pneumatic
pressure supplies to the robot!
For Foundry Prime robots:
Do not turn off the air pressure to motors and SMB.
2.
CAUTION!
The cable package is sensitive to mechanical
damage. They must be handled with care,
especially the connectors, in order to avoid
damaging them.
3. Push the cable harness and connectors carefully
down through the cable guide in the center of the
frame.
Make sure that the cables are not twisted with each
other!
4. Reconnect the earth cable.
5. Reconnect the connectors R1.MP and R1.SMB at
base.
6. Refit the rear cover plate with its attachment screws. Shown in the figure
4.3.4. Replacement of cable harness, Cleanroom
Note
xx0800000046
Parts:
Shown in the figure
cable harness, Cleanroom on
page
Shown in the figure
cable harness, Cleanroom on
page
cable harness, Cleanroom on
page
4 Repair
Continued
A: Cable harness
Location of
224.
Location of
224.
Location of
224.
Continues on next page
231

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 6640id

Table of Contents