4. Remove (4x) M4 screws that hold the docking bracket.
5. Remove the Docking Bracket.
Adjustments/Repairs
Installation Procedure
1. Place the Docking Bracket in position and tighten the (4x) screws.
2. Do GP 6.4 Dock the Punch to connect the Punch to the upstream
and downstream devices.
3. Connect the Communication cable.
4. Connect the Power Cord.
GBC StreamPunch Ultra/Ultra MP
02-03-2017
4-16