Arp 2.24 Timing Pulley Replacement - GBC StreamPunch Ultra Service Manual

Table of Contents

Advertisement

ARP 2.24
Timing Pulley Replacement
PARTS LIST ON PL 2.9
Use this procedure to remove and install the Timing Pulley.
Removal Procedure
WARNING
Do not perform Repair activities with the power on or electrical
power supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury.
1. Disconnect the Power Cord.
2. Do ARP 1.6 to remove the Rear Cover.
3. Do ARP 2.25 to remove the appropriate Timing Belt from the Pulley.
4. Remove the retaining ring from the roller shaft.
5. Remove the Timing Pulley by sliding it out.
GBC StreamPunch Ultra/Ultra MP
6. Place the Timing Pulley in position on the Shaft and install the
retaining ring.
7. Do ARP 2.25 to install the appropriate Timing Belt.
8. Do ADJ 1.4 Timing belt adjustment for the appropriate belt tension
adjustment.
9. Do ARP 1.6 to install the Rear Cover.
10. Connect the Power Cord.
02-03-2017
4-55
Adjustments/Repairs

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Streampunch ultra mp

Table of Contents