Arp 3.23 Die Rail Assembly And Die Rail Springs Replacement - GBC StreamPunch Ultra Service Manual

Table of Contents

Advertisement

ARP 3.23
Die Rail Assembly and Die Rail Springs Replacement
PARTS LIST ON PL 4.10
Removal Procedure
Use this procedure to remove and install the Die Rail Assembly and Die
Rail Springs
WARNINGDo not perform Repair activities with the
power on or electrical power supplied to the machine.
Some machine components contain dangerous
electrical voltages that can result in electrical shock and
possible serious injury.
1. Disconnect the Power Cord.
2. Do ARP 1.6 to remove the Rear Cover.
3. Do ARP 3.1 to remove the Punch Module.
4. Do ARP 3.24 to remove the Alignment sensor bracket and Alignment
Sensor bottom guide.
5. Unplug Back Gage Sensor Board and release the wires from cable
clamps.
6. Remove the Screws (2) that hold the Dieset Recognition Bracket.
Adjustments/Repairs
7. Remove the (2) Screws from the front and (2) screws from the back
that hold that Die Rail Assembly.
8. Remove the Die Rail Assembly.
9. Die rail springs can be replaced at this point by unscrewing M2
screws (4) and M2 lockwashers (4). If you are replacing only the
springs, go to Installation procedure.
GBC StreamPunch Ultra/Ultra MP
02-03-2017
4-118

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Streampunch ultra mp

Table of Contents