GBC StreamPunch Ultra Service Manual page 125

Table of Contents

Advertisement

Installation Procedure
1. Place the Bearing Housings (2) on the ends of the Idler Roller Shaft.
2. Place the new Idler Roller with the Bearing Housings (2) into the
Bushing Forks.
3. Make sure the flat surface of the bushing aligns in the fork.
4. Rollers are non-directional so it does not matter which end goes in
each fork.
5. After the assembly is in place, gently pull the assembly outward and
release to ensure it moves freely in the fork.
6. Place the Extension Spring (2) over the Bearing Housings (2).
7. Place the hooks on the ends of the Extension Springs (2) on the
notches at the top of the Bushing Forks (2).
8. Connect the Power Cord.
GBC StreamPunch Ultra/Ultra MP
02-03-2017
4-45
Adjustments/Repairs

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Streampunch ultra mp

Table of Contents