Rtp 4.3; Check Solenoids Sol 3 To Sol 8 - GBC StreamPunch Ultra Service Manual

Table of Contents

Advertisement

RTP 4.3

Check Solenoids SOL 3 to SOL 8

Use this RTP to check Solenoids SOL3, SOL4, SOL5, SOL6, SOL7, and
SOL8.
1. Open the front the door and insert an Interlock Cheater into the
Punch Door interlock Switch SW4 (PL 1.2).
WARNING
Moving Parts, keep hands clear of nips and the belts when
the Interlock Cheater is inserted.
2. Do GP 6.2.6 SOLENOIDS Procedure to activate and deactivate the
affected solenoid.
When the solenoid is not activated, the idler roller should be able to
rotate freely, and in turn drive the drive roller.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
not activated
When the solenoid is fully activated, the idler roller should completely
lift off and not be able to drive the drive roller.
NOTE: Disengaging solenoid modules need to be Replaced every 5
million cycles.
To check the holding force of the solenoid, go to Step 3
If the solenoid does not actuate, go to Step 4
GBC StreamPunch Ultra/Ultra MP
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
fully activated
Alternate solenoid inspection method:
Mark a line on the idler roller shaft as shown in the picture.
Motor running + Solenoid actuated = Line not visible
Motor running + Solenoid not actuatuated = Line visible
Picture shows Motor running and solenoid actuated.
From the service mode solenoid can be actuated using GP 6.2.6
Solenoids Procedure, and the corresponding drive roller rotated
manually to check this.
11-05-2018
2-44
RTPS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Streampunch ultra mp

Table of Contents