GBC StreamPunch Ultra Service Manual page 108

Table of Contents

Advertisement

7. Do ARP 2.4 to remove the Acceleration Idler Roller Panel.
8. Unhook the Acceleration Panel Latch Springs (2).
Acceleration Panel Latch Springs
Adjustments/Repairs
Acceleration Roller Idler Assembly
9. Do ARP 2.26.1 to remove the Drive Roller for Roller N5.
10. Open the Cable Clamps and release the Sensor Cables.
Cable Clamps
11. Disconnect the Clear Cover Sensor.
(Cont.)
GBC StreamPunch Ultra/Ultra MP
02-03-2017
4-28
Drive Roller
Sensor board
connectors
Clear Cover
sensor

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Streampunch ultra mp

Table of Contents