10. Place the Bearing Bracket in position and tighten the Screws (2).
11. Place the Ball Bearing in position.
12. Place the Nylon Washer in position.
13. Place the E-Ring in position.
NOTE: The tension on the Belt is set using the reference marks on
the punch motor bracket (see ARP 3.5).
14. Do ARP 1.6 to install the Rear Cover.
15. Connect the Power Cord.
Adjustments/Repairs
Mark
02-03-2017
4-88
GBC StreamPunch Ultra/Ultra MP