Paper Path; Arp 2.1 Lower Entrance Panel Replacement - GBC StreamPunch Ultra Service Manual

Table of Contents

Advertisement

2. Paper Path

ARP 2.1 Lower Entrance Panel Replacement

PARTS LIST ON PL 2.1
Use this procedure to remove and install the Lower Entrance Panel.
Removal Procedure
1. Disconnect the Power Cord.
2. Do GP 6.3 to undock the Punch from the upstream and downstream
equipment.
3. Do ARP 1.6 Rear Cover Replacement to remove the Rear Cover.
4. Do ARP 1.17 Drive Roller Cover removal for the entrance side cover.
5. Open the Upper Bypass Assembly.
6. Remove the Entrance guide by removing (2) M4 screws.
7. Remove the Screws (2) from the Front Frame used to mount the
Lower Entrance Panel.
8. Remove the Screws (2) from the Rear Frame used to mount the
Lower Entrance Panel.
Adjustments/Repairs
9. Remove the Lower Entrance Panel.
Installation Procedure
1. Place the Lower Entrance Panel in position.
2. Tighten the Screws (4) used to mount the Lower Entrance Panel
3. Close the Upper Bypass Assembly.
4. Do ARP 1.6 Rear Cover Replacement to install the Rear Cover.
5. Do ARP 1.17 Drive Roller Cover removal to replace the cover.
6. Do GP 6.4 to dock the Punch to the upstream and downstream
equipment.
7. Connect the Power Cord.
Screws (2)
8. Do ADJ 1.2 Diverter Solenoid Adjustment.
02-03-2017
4-20
Screws (2)
GBC StreamPunch Ultra/Ultra MP

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Streampunch ultra mp

Table of Contents