Gp 6.22 Solenoid Cleaning And Inspection - GBC StreamPunch Ultra Service Manual

Table of Contents

Advertisement

GP 6.22 Solenoid Cleaning and Inspection

Do the following to inspect and clean the Solenoids every 1000K cycles.
1. Open the front the door and insert an Interlock Cheater into the
Punch Door interlock.
Moving Parts, keep hands clear of nips and the belts when the
Interlock Cheater is inserted.
2. Do GP 6.2.6 SOLENOIDS Check to activate and deactivate the
affected solenoid.
When the solenoid is not activated, the idler roller should be able to
rotate freely and in turn will drive the drive roller.
not activated
When the solenoid is fully activated, the idler roller should completely
lift off and not be able to drive the drive roller.
NOTE: Disengaging solenoid modules need to be replaced every 5
million cycles.
General Procedures and Information
WARNING
fully activated
3. Clean the solenoid and surrounding area with a vacuum cleaner and
canned air.
1. Make sure the solenoid is clean and dry.
2. Inspect for dirt or obstructions, wear or a damage spring.
3. Inspect and ensure the Solenoid linkage moves freely. Press linkage
down and release. Linkage should return.
Note: Do not apply lubricants to the solenoid or linkage.
GBC StreamPunch Ultra/Ultra MP
11-05-2018
6-64

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Streampunch ultra mp

Table of Contents