Gp 6.3 Undock The Punch (Moving The Punch To Service Position); Dock The Punch (Moving The Punch To Operating Position) - GBC StreamPunch Ultra Service Manual

Table of Contents

Advertisement

GP 6.3
Undock the Punch (Moving the punch to Service position)
Use this procedure to move the punch to Service position
1. Unplug the AC power cord.
2. Unplug the Communications cable.
3. Unscrew the locking screw.
4. Pull on the release tab until the docking mechanism unlatches.
5. Follow the instructions for undocking the downstream device.
After undocking,
General Procedures and Information
GP 6.4

Dock the punch (Moving the punch to Operating position)

Use this procedure to move the StreamPunch Ultra/Ultra MP to operating
position.
1. Slide the punch to Operating position, ensure the positioning
stud in the upstream device slides into the positioning plate.
2. Slide in the upstream and downstream docking mechanisms and
install the locking screws.
3. Connect the Communications cable.
4. Connect the AC power cord.
5. Run a small test job in both Punch and Bypass mode to ensure
the machine is working properly.
GBC StreamPunch Ultra/Ultra MP
11-05-2018
6-44

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Streampunch ultra mp

Table of Contents