GBC StreamPunch Ultra Service Manual page 34

Table of Contents

Advertisement

13. Check for input voltage - 110 VAC (60 Hz) or 240 VAC (50 Hz) – on
Cable 7715598 at the Pin J14 on the Communications Board (BRN &
BLU wires).
There is AC power on Cable 7715598 at Pin J14 on the
Communications Board.
Yes-
Go to Step 14
No-
14. Check for input voltage - 110 VAC (60 Hz) or 240 VAC (50 Hz) – on
Cable 7715494 at Pin J15 on the Communications Board (BLU &
BRN wires).
There is AC power on Cable 7715494 at Pin J15 the
Communications Board.
Yes-
Go to Step 15
No-
Replace the Communications Board (ARP 5.2).
15. Check for input voltage - 110 VAC (60 Hz) or 240 VAC (50 Hz) – on
Cable 7715494 at Pin J4 on the Control Board (BLU & BRN wires).
There is AC power on Cable 7715494 at Pin J4 the Control Board.
Yes- Replace the Main Control Board (ARP 5.1).
No- Replace Cable 7715494
GBC StreamPunch Ultra/Ultra MP
Replace Cable 7715598.
11-05-2018
2-17
RTPS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Streampunch ultra mp

Table of Contents