Gestetner G060 Service Manual page 423

Table of Contents

Advertisement

1.3 INSTALLATION WORK FLOW
Unpack the printer.
Will the paper feed unit (PFU) or LCT be
installed?
Yes
1. Place the printer on the PFU or LCT.
2. Install the PFU or LCT.
Install the controller options (if required).
Install the duplex unit (if required).
Will the rack be installed?
Yes
1. Install the printer.
2. Assemble the rack during printer
initialaization
Dock the printer and rack.
Install the CF expander.
Install the platen cover or ARDF.
NOTE: Install the fax unit after making sure that the CF expander works properly.
( "1. Installation" in the service manual for the fax option)
SM
No
No
Install the printer
1-5
INSTALLATION WORK FLOW
Will the two-tray finisher be installed?
Yes
Install the punch unit (if required).
Install the multi-bin
output tray (if required).
Install the two-tray finisher.
Select the language.
Set the date and time.
Clear the memory of IPU/Net file/
Scanner. (SP5-801-9, 10, 12)
Perform ACC.
Check magnification and registration.
Adjust the operation panel display if
necessary.
Set the meter charge mode depending
on the service contract.
No
G570I905.WMF
G570

Advertisement

Table of Contents
loading

This manual is also suitable for:

G570G082

Table of Contents