Developer Initialization - Gestetner G060 Service Manual

Table of Contents

Advertisement

PROCESS CONTROL

6.2.6 DEVELOPER INITIALIZATION

When the machine detects that a new development unit has been installed, it
initializes the developer.
To do this, the machine agitates the developer for about 90 seconds, and adjusts
V
(control voltage for TD sensor) so that V
CNT
0.1 volts. The machine stores this V
V
is corrected for the current humidity every print job. V
CNT
the total number of prints, to prevent the developer Q/M from varying.
If the humidity correction is giving poor results (for example, if the humidity sensor
is broken), it can be disabled with SP2-223-2. Then a value for V
manually using SP2-224-1 to -4 (adjust by trial and error).
During developer initialization, the machine forcibly supplies toner because there is
no toner inside the toner transport tube at installation. Then the machine does the
process control self check.
G060
(TD sensor output) becomes 3.0 ±
T
as V
.
T
REF
6-16
is also corrected for
CNT
must be input
CNT
SM

Advertisement

Table of Contents
loading

This manual is also suitable for:

G570G082

Table of Contents