Toyota Celica 1993 AT200 series Repair Manual page 642

For chassis & body
Table of Contents

Advertisement

STEERING _ STEERING
COLUMN
H o l l o w - T i p p e d
3.
SELECT TILT NO.2 BOLTS
Select the bolt with the hollow-tipped thrEad end
w h € n t h 6 c o l u m n u p p s r t u b e m a r k i s 1 , a n d t h o b o l t
with the olain thread end when the mark is 2.
NOTICE: Soloct the bolt typo to match cach number
marked in tho squaTor on thc uppor tubo.
4.
INSTALL COLUMN UPPER TUBE WITH MAIN
SHAFT ASSEMBLY
(a) Install the upper tube with the shaft assembly into th€
lowgr tu be.
(b) Using a vise, press in the 2 tilt No.2 bolts'
N O T I C E : D o n o t t i g h t o n t h e v b e t o o t l g h t .
5.
INSTALL TILT LEVER LOCK SHAFT, TILT LEVER
ASSEMBLY, TILT SUB LEVER AND TILT LEVER
6.
INSTALL RIGHT AND LEFT TILT PAWLS
(a) Temporarily tighton the nut'
HINT: Install the pin of the pawls into the long hole of
the tilt levor and tilt sub lev€r.
(b) Tighten tho tilt lEver assembly set bolt.
Torque: 2.9 N.m (30 kgf'cm,26 In.'lbf)
Tilt Sub L€v€r

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Celica 1993 st20 series

Table of Contents