REMOVAL/INSTALLATION
Remove the under cowl (page 2-13).
Remove the dust cover.
Remove the terminal screw and disconnect the EOP
switch wire.
Remove the EOP switch while holding the switch
base.
Apply liquid sealant (Three Bond 1207B or equiva-
lent) to the EOP switch threads.
Install and tighten the EOP switch to the specified
torque while holding the switch base.
TORQUE: 12 N·m (1.2 kgf·m, 9 lbf·ft)
Connect the EOP switch wire terminal and tighten
the screw to the specified torque.
TORQUE: 1.9 N·m (0.2 kgf·m, 1.4 lbf·ft)
Install the dust cover.
Start the engine and check that there are no oil leaks
and indicator function.
Install the under cowl (page 2-13).
LIGHTS/METERS/SWITCHES
TERMINAL SCREW
DUST COVER
3 – 4 mm (0.1 – 0.2 in)
EOP SWITCH
TERMINAL SCREW
EOP SWITCH
SWITCH BASE
DUST COVER
20-19