Honda Transalp XL700V Manual page 199

Hide thumbs Also See for Transalp XL700V:
Table of Contents

Advertisement

FUEL SYSTEM (PGM-FI)
INSTALLATION
Check the insulator band angle.
• Align the insulator band hole with the insulator
boss.
Install the throttle body to the insulators.
Tighten the insulator band screw so that the insula-
tor band distance is 12 ± 1 mm (0.5 ± 0.04 in).
Connect the CMP sensor 2P (Natural) connector and
throttle body sub harness 14P (Gray) connector.
5-68
Align
INSULATORS
12 ± 1 mm
(0.5 ± 0.04 in)
2P (NATURAL) CONNECTOR
14P (GRAY) CONNECTOR

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Transalp xl700va

Table of Contents