Nortel DMS-100 Series Maintenance Manual page 96

Remote line concentrating module
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

1-80 Maintenance overview
SREX scheduling
Note 1: The REX tests can run on LCM 0 and LCM 1 at the same time with
Note 2: The REX tests cannot run on LCM 2 through LCM 7 if a REX test
Separation of the LCM_REX_TEST and the LCMCOV_REX_TEST allows
site REX_TEST information to complete faster. The LCM_REX_TESTs,
without restrictions of the converter voltage and ring tests, run at the same
time. These tests can be scheduled separately for optimum execution
periods.
Feature AF3234 provides the following REX test improvements for LCM
peripherals and variants:
297–8351–550 Standard 04.01 August 1999
LTC 0
LCM 0
1
RLCM 0
REX tests that run on RCC 0 and LGC 0.
runs on LGC 0.
Note: The LCMCOV_REX_TEST is performed on LCMs, XLCMs,
OPMs, and RLCMs.
ESA REX test
LCM and ESA-independent REX test
MAP command for manual REX test
fault indicators
REX test maintenance record
Network
LCM 2
RCC 0
OPM 0
LGC 0
7

Advertisement

Table of Contents
loading

Table of Contents