Nortel DMS-100 Series Maintenance Manual page 232

Remote line concentrating module
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

7-48 RLCM alarm clearing procedures
RLCM
major
(continued)
11
12
13
297–8351–550 Standard 04.01 August 1999
To identify the P-side links that have faults, type
>TRNSL P
and press the Enter key.
Example of a MAP response:
Link 2:LCM REM1 00 0
Link 6:LCM REM1 00 0
Record information for the links that have a state other than OK.
To busy the link that has faults, type
>BSY LINK link_no
and press the Enter key.
where
link_no
is the number of a P-side link identified in step 11
To test the busy link, type
>TST LINK link_no
and press the Enter key.
where
link_no
is the number of a P-side link busied in step 12
If test
passes
fails
0;Cap MS;Status:OK
1;Cap MS;Status:SysB ;MsgCond: CLS
Do
step 14
step 21
;MsgCond: OPN