Nortel DMS-100 Series Maintenance Manual page 95

Remote line concentrating module
Hide thumbs Also See for DMS-100 Series:
Table of Contents

Advertisement

SREX system dependencies
IPL
Register
LCM
SREX database
LCM objects
The converter voltage and ring test parts of LCM_REX_TEST require wait
states and different test resources. These states and test resources cause
delays that are not acceptable in SREX main task execution. The
LCMCOV_REX_TEST that runs at a lower priority implements these tests
separately from the LCM_REX_TEST. The LCMCOV_REX_TEST
requires logical test unit (LTU) connections in the maintenance line card.
An LCM unit can only access the single LTU when the other unit is out of
service. This resource limit does not allow the execution of several
LCMCOV_REX_TESTs at the same time. The entry of data in the
PARALLEL execution field for LCMCOV_REX_TEST in table
REXSCHED allows a maximum of one.
LCM REX
LCM
SREX
Aspect
Gates
SREX controller
Table OFCVAR
NODEREXCONTROL
DMS-100 Family RLCM Maintenance Manual XPM12 and up
Maintenance overview 1-79
LCM TC
LCM
Objects
Table REXSCHED
LCM_REX_TEST
LCMMTC
LCM CI
Manual
TST REX

Advertisement

Table of Contents
loading

Table of Contents