Application
Use this procedure to test power converter voltages for all power converters
in the host interface shelf (HIE).
Interval
Perform this procedure in six month intervals.
Common procedures
Does not apply
Action
This procedure contains a summary flowchart as an overview of the
procedure. Follow the exact steps to perform this procedure.
13-5
Testing power converter voltages
Testing power converter voltages
DMS-100 Family RLCM Maintenance Manual XPM12 and up
Routine maintenance procedures
13-5