ABB IRB 7600 Series Product Manual page 369

Hide thumbs Also See for IRB 7600 Series:
Table of Contents

Advertisement

3. Drain the oil from gearbox 1.
4. Disconnect all cabling in the rear of the
5. Pull the disconnected cabling up through
6. Remove the complete arm system.
7. Remove the robot's attachment screws to
8. Attach the lifting device, base and gear 1
9.
10. Lift the robot base to allow fitting the
11. Fit the support, base.
12. Remove the bottom plate from underneath
3HAC022033-001 Revision: K
工控帮助教小舒QQ2823408167
Action
robot base and remove the cable support
plate inside of the base.
the center of gearbox 1.
unfasten the base from the foundation.
and the lifting tool (chain), to the gearbox.
CAUTION!
The base and gearbox weighs 510 kg
together! All lifting equipment must be used
accordingly!
support, base and gear 1 on each sides of
the base.
Make sure the base remains in a stable
position before performing any work
underneath the base!
the base in order to get access to the
attachment screws. It may be necessary to
also remove the rear connector plate.
4.7.1. Replacement of gearbox, axis 1
Note
Detailed in section
Oil change, gearbox
axis 1 on page
199.
Detailed in section
Removal, complete
arm system on page
264.
Art. no. is specified in
Required
equipment on page
365.
Art. no. is specified in
Required
equipment on page
365.
xx0300000612
A: Bottom plate
B: Rear connector plate
C: Attachment screw
D: Groove
Continues on next page
4 Repair
Continued
367

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents