3 Maintenance
3.5.2. Rust preventive measures, bearing axis 1 (Foundry Prime)
Continued
Procedure
The following procedure details how to apply the rust preventive on bearing axis 1.
1.
2. Remove the plastic ring.
3. Wipe the surface under the plastic ring.
224
工控帮助教小舒QQ2823408167
Action
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
Turn off all electric power and hydraulic but not
the air pressure to the gearboxes, motors and
SMB.
Note
A
xx0600002866
Parts:
•
A: Plastic ring
Continues on next page
3HAC022033-001 Revision: K