ABB IRB 7600 Series Product Manual page 302

Hide thumbs Also See for IRB 7600 Series:
Table of Contents

Advertisement

4 Repair
4.5.1. Replacement of SMB unit
Continued
2.
3. Remove the SMB unit as detailed in
4. Refit the new SMB unit according to step 3 - 6 in
5.
6. Apply rust preventive on the surface around the
7. Perform a leakdown test according to
8. Update the revolution counter!
9.
300
工控帮助教小舒QQ2823408167
Action
esd
WARNING!
The unit is sensitive to ESD. Before handling the
unit please read the safety information in the section
WARNING - The unit is sensitive to ESD! on page
49
unit on page 298
Refitting, SMB unit on page 298
NOTE!
Make sure that the gasket under the SMB cover is
not damaged!
Secure the SMB cover with its attachment screws.
SMB cover and under/on top of the screw heads.
air hoses (Foundry Prime) on page
DANGER!
Make sure all safety requirements are met when
performing the first test run. These are further
detailed in the section
DANGER - First test run may
cause injury or damage! on page
Note
Removal, SMB
Inspection of
191.
See
Updating revolution counters
on page
408.
47.
3HAC022033-001 Revision: K

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents