Toyota Celica Supra 1986 Service And Repair Manual page 394

Table of Contents

Advertisement

AUTOMATIC TRANSMISSION
-
Installation
of Transmission
AT-119
.....
2
1.
CONNECT TAIL PIPE AND FRONT PIPE
(a)
Connect
the
pipe
to the tail pipe.
(bl
Install the
two
rubber hangers.
(c)
Install
the pipe
clamp
to the transmission
case.
Torque
:
440 kg·cm (32 ft·lb, 43 N·ml
22. INSTALL INTERMEDIATE PROPELLER SHAFT
23. CONNECT
WIRING
CONNECTORS TO NEUTRAL START
AND BACK-UP LIGHT SWITCHES
24.
CONNECT
TRANSMISSION
THROTTLE
CABLE
{a)
Connect the
cable
to the throttle
linkage.
(b) Connect the cable housing to
the
bracket.
25. ADJUST TRANSMISSION
THROTTLE
CABLE
26. CONNECT UPPER RADIATOR HOSE AND FILL WITH
COOLANT
27. CONNECT BA TTERV CABLE
TO NEGATIVE
(-
)
TERMINAL

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents