Toyota Celica Supra 1986 Service And Repair Manual page 39

Table of Contents

Advertisement

ENGINE IIIIECHANICAL
-
Timin9
Belt
EM-17
(g) Using SST to
hold the
pulley,
install
the
bolt.
SST 09278-5401
2
Torque:
700 kg·cm
(61
ft·lb,
89 N•ml
CAUTION:
Oo not mako
use
of
tho timing
belt
tension
when
tightening tho bolt.
lhl Loosen the
id
ler pulley
set bolt.
m
Turn
the
crankshaft clockwise two
times.
ljl
Retighten
the
idler
pulley
set bolt.
10. CHECK TIMING MARKS
tal
Rotate
the crankshaft two
times
clockwise.
lbl Check
the
timing
marks.
(Refer
to
the
section of
IN·
SPECTION
AND
ADJUSTMENT OF
VALVE
TIMING
-
see
page
EM·
71
11. CHECK TIMING BELT TENSION
I See
ttep 10
on
pogo EM-11
I
12.
INSTALL CYUNDER HEAD COVER AND GASKET ON
EXHAUST SIDE
13. INSTALL OIL FILLER CAP
14. INSTALL
NO.
3 nMING BELT COVER AND GASKET
16.
INSTALL
FLUID COUPLING WITH FAN SHROUD
16. INSTALL RADIATOR UPPER HOSE
17.
INSTALL DRIVE BELTS
ISeo
pogo
MA-41
16.
INSTALL AIR CLEANER
CASE
WITH AIR
INTAKE
CONNECTOR
19.
FILL
WITH
COOLANT
20. CONNECT CABLE TO NEGAnVE TERMINAL Of BATIERY

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents