20.6 Precautions

Connection to FXCPU
(1) When connecting to FX
When the keyword of FXCPU (FX
set, GOT may not be able to monitoring.Perform an I/O
check again.
(
14.1.6 I/O check) When the result of the I/O
check is normal, check the status of keyword
registration.
(2) When connecting with function extension board or
communication special adapter
When a sequence program and settings that the
FXCPU communicates with devices other than the
GOT are set with software, including GX Developer, the
FXCPU cannot communicate with the GOT.
(a) Settings with sequence program
Check the sequence program and delete the
following.
FX SERIES PROGRAMMABLE
CONTROLLERS USER'S MANUAL - Data
Communication Edition
• No protocol communication (RS instruction)
• Sequence program with the computer link, N:N
network, and parallel link
• Parameter setting
• Set the following special registers to 0.
Except FX
, FX
3U
3UC
FX
, FX
: D8120, D8400, D8420
3U
3UC
FX
, FX
, FX
3G
3GC
3GE
D8370
FX
: D8120, D8400
3S
(b) Settings with GX Developer
Select [PLC parameter] in [Parameter], and then
click the PLC system(2) tab on the FX parameter
screen.
Uncheck [Operate communication setting], and
then transfer the parameter to the programmable
controller. After the transfer, turn off the
programmable controller, and then turn on the
programmable controller again.
series
3
series) has been
3
: D8120
: D8120, D8400, D8420,
Connection in the multiple CPU system
When the GOT is connected to multiple CPU system,
the following time is taken until when the PLC runs.
• QCPU (Q mode), motion controller CPU (Q series):
10 seconds or more
• MELDAS C70: 18 seconds or more
When the GOT starts before the PLC runs, a system
alarm occurs.Adjust the opening screen time in the
GOT setup so that no system alarm occurs.
GT Designer3 Version1 Screen Design Manual
Connection to LCPU
LCPU may diagnose (check file system, recovering
process, etc.) the SD memory card when turning on the
power or when resetting.
Therefore, it takes time until the SD memory card
becomes available.When the GOT starts before the SD
card becomes available, a system alarm occurs.Adjust
the opening screen time in the GOT setup so that no
system alarm occurs.
GT Designer3 Version1 Screen Design Manual
Connection to basic model QCPU
Do not set the serial communication function of Q00UJ/
Q00U/Q01U/Q02UCPU, Q00/Q01CPU.If the function is
set, the communication may not be performed.
Connection to Q170MCPU
Set [CPU No.] to "2" in the device setting to monitor the
device of the Motion CPU area (CPU No.2).
When the CPU No. is set to "0" or "1", the device on the
PLC CPU area (CPU No.1) is monitored.
When the CPU No. is set to the number other than "0"
to "2", a communication error occurs and the monitoring
cannot be executed.
For setting the CPU No., refer to the following manual.
GT Designer3 Version1 Screen Design Manual
Example) Setting dialog box of the bit device
20. DIRECT CONNECTION TO CPU
20.6 Precautions
20
21
22
23
24
25
26
27
20 - 17

Advertisement

Table of Contents
loading

Table of Contents