Mitsubishi Electric GT16 User Manual page 362

Got1000 series
Hide thumbs Also See for GT16:
Table of Contents

Advertisement

Installing the CoreOS
1.
Write the CoreOS from GT Designer3 to the CF card.
For details of GT Designer3 operation, refer to the following manual.
GT Designer3 Version1 Screen Design Manual (Fundamentals)
2.
After confirming that the GOT is powered off, install the CF card in the GOT.
After installing, switch the CF card access switch on.
3.
Powering the GOT on displays the following screen.
To cancel the installation, power the GOT off and remove the CF card.
16 - 12
16. INSTALLATION OF COREOS, BOOTOS AND STANDARD MONITOR OS
16.5 CoreOS

Advertisement

Table of Contents
loading

Table of Contents